[Best_Wordpress_Gallery id=”8″ gal_title=”The Clyde’s Gallery”]
The Clyde’s biomass heating and hot water installations project
Mechanical main contract
Cumbria Mechanical and J&J Electrical successfully secured the mechanical and electrical installation of this Biomass boiler project to supply heating and hot water to 231 flats within 2 high rise tower blocks encapsulated in 1 boiler room.
Our package included:
Biomass boiler and back up gas boiler installation and associated controls
District heating main
Distribution pipework and risers to 231 flats over 16 floors